Basement painting · Calgary, AB
Basement painting in Calgary
Freshly developed basements, bare concrete, and open-joist ceilings. Describe the space and a local contractor will check it and quote.
Free estimate · No obligation
Typical requests
- New basement development ready for paint
- Suite or rec room refresh
- Painting concrete foundation walls
- Spraying an open-joist ceiling
- Laundry and utility room cleanup
- Priced by
- Wall and ceiling area, new versus painted surfaces, spray setup and masking.
- First question
- Is the space dry? Moisture problems come before paint.
- New drywall
- Needs a primer coat before the finish coats.
Three different jobs
Which basement do you have?
“Basement painting” covers three quite different projects. Knowing which you have helps you describe it.
A new development
Taped and sanded drywall, never painted. Needs a drywall primer, then finish coats. Usually quoted by area once the drywall is ready.
A finished basement
Painted before, now tired. Treated like any interior repaint: fill, sand, spot prime and recoat.
An unfinished basement
Bare concrete walls and open joists. Moisture checks come first, then masonry coatings on walls and a sprayed finish overhead.
Moisture
Dry first, paint second
Basements sit against the ground, and concrete passes moisture. Paint on a wall that is still damp from the inside will blister and peel, and a waterproof-looking coat can hide the early warning signs of a drainage problem.
Simple checks you can do
- Look for white, powdery deposits on concrete. That is efflorescence, left by water moving through.
- Check the base of walls and corners after heavy rain or snowmelt.
- Tape a square of plastic sheet tightly to the concrete and leave it a day or two. Condensation under it suggests moisture coming through the wall.
If there is active water, the fix is outside the house: grading, downspouts or foundation work. Tell the painter what you have seen so they can judge whether the wall is ready.
New development
Painting a newly developed basement
The most common basement request. The order is designed so the ceiling and walls do not mark each other.
Step 1: Inspect the drywall finish
Painters check the taping and sanding. Paint magnifies ridges and pinholes, so problems are raised before priming.
Step 2: Prime everything
A drywall primer seals the paper and mud so the finish coats look even.
Step 3: Ceilings, then walls
Often sprayed in an empty new basement, which is fast and even. Then two finish coats on walls.
Step 4: Trim and doors
Usually the last step, in a more durable sheen. Sometimes installed pre-finished instead.
Development nearly finished?
Request a quote before the drywall is done so the painter can plan around your builder’s schedule.
Rental or legal suite?
If the basement is a secondary suite, say so. Tenants, separate entrances and scheduling around occupants all affect how the painter plans the job.
Common questions
Basement painting questions
Question not answered here? Ask it in your quote request.
What primer does new basement drywall need?
Can bare concrete basement walls be painted?
Why are unfinished basement ceilings often painted black?
Is painting part of a basement development contract?
Related
Also worth reading
- ServiceInterior paintingThe upstairs rooms follow the same process, without the moisture questions.
- ServiceCeiling paintingDrywalled basement ceilings are painted like any other ceiling.
- GuideChoosing paint sheenBasements benefit from washable sheens in rec rooms and hallways.
- GuidePreparing for a painting estimateWhat the painter will want to know before quoting a new development.
Free, no-obligation estimate
Get a free basement painting quote
Describe the basement and what stage it is at. The contractor will check the surfaces and moisture before quoting.
Useful to include
- New drywall, previously painted walls, or bare concrete
- Finished drywall ceiling or open joists
- Approximate size, or number of rooms
- Any history of water or dampness in the basement
Get a free painting quote
About two minutes. Fields marked * are required.