Guide · The project
How a house painting project runs
Short answer
A typical project goes estimate → written quote → agreement and scheduling → protection and prep → primer → finish coats → touch-ups and walkthrough. Most of the labour is in preparation, not the finish coats. Knowing the sequence helps you plan around the work and spot when a step is being skipped.
The stages, in order
Step 1: Estimate visit
The painter sees the rooms or walls, asks about colours and timing, and notes prep and access.
Your part: have your scope list ready. See preparing for a painting estimate.
Step 2: Written quote
Scope, surfaces, prep, coats, products, price, payment terms and an estimated schedule.
Step 3: Agreement and scheduling
You accept, confirm dates and colours, and agree who moves what. Exterior dates stay weather dependent.
Step 4: Protection
Floors, furniture, fixtures, landscaping and windows are covered or masked.
Step 5: Preparation
Washing, scraping, filling, sanding and caulking. The longest stage on most jobs.
Step 6: Primer
On repairs, bare surfaces, stains and glossy or incompatible old finishes.
Step 7: Finish coats
Usually two, with drying time between. Ceilings, then walls, then trim indoors; top down outdoors.
Step 8: Touch-ups and walkthrough
Masking comes off, the crew fixes misses, cleans up and walks through with you.
Living in the house during the work
Interior jobs usually move room by room, so most of the house stays usable. Expect some noise from sanding, the smell of paint for a day or so in each room even with low-odour products, and furniture moved around. Keep pets away from wet paint and open trays.
Exterior projects and the weather
Outside, the sequence is the same but the schedule depends on temperature, rain and wind. Crews often work the shady side of the house and follow the sun around so paint is not applied to a hot surface. Rain days push the finish date. See when to paint a house exterior in Calgary.
After the painters leave
Paint keeps hardening for a while after it feels dry. Be gentle with washing walls and with hanging pictures for the first couple of weeks, and ask the painter for their guidance on the specific product. Keep leftover paint, labelled with the room, for touch-ups.
Related questions
Why does prep take longer than painting?
How long should I wait between coats?
What should I check at the final walkthrough?
Next
Where to go from here
Prepare for the estimate
The first step, and the one you can influence most.
Questions to ask a painter
Make sure the agreement covers each stage described here.
Choosing paint sheen
The decisions you will be asked to make before painting starts.